🔍
Form 52722 Utility Level Data - YouTube
Channel: unknown
[0]
Welcome to the OpFund Web Portal Training Video
on Viewing and Updating Non-Frozen, Frozen EPC,
[6]
Frozen Other, and Flat Rate Utilities Data. For
information on creating a point of contact and
[11]
initializing the Form 52723, please reference
the related training video and user guide.
[17]
Let’s start our review of the Form
52722 Utility and related data section.
[22]
The form HUD-52722 is a child form to the
HUD-52723 and contains pre-populated data.
[29]
PHAs can only update the yellow highlighted
fields. Your PHA will complete form HUD-52722
[36]
to calculate the project’s utility expense level
portion of the OpFund formula. All utilities,
[41]
including electricity, gas, water, and sewer,
must be completed to submit the forms HUD-52722
[48]
and HUD-52723. Projects that do not include
PHA-paid utilities or specifically directed by
[54]
HUD are not required to complete this section.
From the project page, select the Form 52722
[60]
Utility and related data button. The utilities
are listed at the bottom of the page. Utilities
[66]
that have not been updated by your PHA show a red
icon. Those utilities that have been updated by
[71]
your PHA will have a green icon. Select a utility
to open the specific Form HUD-52722 Utility Level
[78]
Line Items for that utility. For information
on adding or deleting a utility, please see the
[83]
related training video and user guide.
Completing HUD-52722 Utility
[86]
Consumption and Costs Sections
PHAs must provide the actual consumption
[89]
and actual utility costs for each utility, or only
the actual utility costs for flat rate utilities.
[96]
The OpFund form tracks utilities submitted
in the previous calendar year OpFund forms.
[101]
Utilities are tracked by type – electricity,
gas, water, and sewer – and by category:
[107]
Non Frozen: The utility is charged based
on consumption and is not participating
[111]
in any frozen rolling base incentives.
Frozen EPC: The project has an Energy Performance
[118]
Contract (EPC), and the utility has a HUD-approved
frozen rolling base incentive. Your PHA should
[124]
submit supporting documentation required by
HUD to support its selection for Frozen EPC.
[130]
Frozen Other: The utility is eligible to
freeze the rolling base consumption based on
[134]
the appropriate incentive program guidance. Please
note that your PHA may not delete the utility or
[139]
change the prepopulated rolling base consumption
or units of consumptions. Additionally, your
[144]
PHA must follow the incentive program guidance
to add additional utilities with Frozen Other
[150]
Flat Rate: The utility is charged
at a fixed fee regardless of usage.
[155]
Please note: A project cannot have a utility with
the same utility category listed more than once.
[160]
Let’s look at these line items
and discuss specific use cases
[163]
for the various utility categories:
[170]
Be sure to review and modify the
fields highlighted in yellow.
[173]
In line 01, enter the Actual consumption for
the reporting period. Your PHA should submit
[178]
supporting documentation required by HUD to
support the actual consumption entered in
[182]
the form. HUD requests supporting documentation to
support the actual consumption for all Non Frozen,
[188]
Frozen EPC, and Frozen Other utilities.
The OpFund Web Portal prepopulates the Unit
[194]
of consumption for the consumption shown
on Line 01 from the previous year’s form.
[199]
The OpFund Web Portal prepopulates the Rolling
base consumption amount with the last three
[203]
years of actual consumption. Your PHA should
submit supporting documentation required by HUD
[209]
to support changes to the rolling base.
If you remove 10% or more of your units, you will
[214]
need to adjust your rolling base. Please review
instructions for form 52722 for further guidance.
[221]
The OpFund Web Portal automatically
calculates the Average Rolling Base.
[225]
In line 7, enter the Actual consumption for new
units included in Line 01 that have less than
[230]
12 months of actual consumption data. Make
sure the consumption reported in this line
[235]
is also included in Line 01. The consumption
entered on this line will be used to adjust
[240]
the rolling base to include new units.
For line 16, Enter the Actual utility
[245]
costs for the reporting period ending June
30th for the consumption entered in Line
[250]
01. Round this amount to the nearest whole
dollar. Your PHA should submit supporting
[254]
documentation required by HUD to support the
actual utility costs entered in the form.
[259]
HUD requests supporting documentation to support
the actual utilities costs for all utilities.
[265]
Enter your data and select
the Apply Changes button.
[268]
Once you select the Apply Changes button, the
% Change column will calculate the percentage
[272]
change of the data that you’ve entered
from the Pre-Pop data. You can select the
[276]
View/Print current form 52722 button to see your
changes reflected immediately in the Form 52722.
[283]
For detailed guidance on entering data in
these fields, please reference the user guide.
[293]
Be sure to review and enter
the line 01 Actual consumption
[297]
and line 16 Actual utility
costs for the reporting period.
[301]
Please note that your PHA can’t
adjust unit of consumption Line 01a.
[306]
The rolling base is prepopulated with
the HUD approved frozen rolling base.
[318]
Your PHA should consult your local HUD Field
Office, the latest OpFund Processing Notice,
[323]
and the instructions for the
Form 52722 for further guidance.
[327]
All PHA updates and requests for
modifications are subject to HUD review.
[332]
When completing the specific utility
information for a Frozen EPC utility,
[336]
be sure to supply the latest approval letter for
that utility in your supporting documentation.
[341]
Enter your data and select
the Apply Changes button.
[344]
Once you select the Apply Changes
button, the % Change column will
[348]
calculate the percentage change of the data
that you’ve entered from the Pre-Pop data.
[356]
Enter the line 01 Actual consumption and line 16
Actual utility costs for the reporting period.
[362]
Please note that your PHA cannot modify
the rolling base consumption level for
[366]
Frozen Other Utilities. Refer to the incentive
[368]
program guidance for instructions
on how to modify the rolling base.
[372]
Enter your data and select
the Apply Changes button.
[375]
Once you select the Apply Changes
button, the % Change column will
[378]
calculate the percentage change of the data
that you’ve entered from the Pre-Pop data.
[388]
For Flat Rate Utilities, the only field to edit
is line 16 Actual utility costs (12-month period).
[394]
Enter your data and select
the Apply Changes button.
[398]
Once you select the Apply Changes
button, the % Change column will
[401]
calculate the percentage change of the data
that you’ve entered from the Pre-Pop data.
[406]
Thank you for watching this OpFund Web Portal
Training Video on Viewing and Updating Non-Frozen,
[411]
Frozen EPC, Frozen Other, and Flat Rate Utilities
Data. For more information on the Forms 52723
[418]
and 52722 submission process, please view the
related training videos. If you have questions
[423]
about Operating Fund Grants, calculating or
understanding Operating Fund eligibility,
[428]
or PIH regulations or notices, please
contact your local Field Office.
[432]
For questions or comments regarding the
OpFund Web Portal, contact REAC TAC by phone
[437]
at 1-888-245-4860 and choose option
#4, or by email at [email protected].
Most Recent Videos:
You can go back to the homepage right here: Homepage





