City Manager's Progress Report: February 2022 - YouTube
Channel: unknown
[10]
I have four items I want to visit with you聽
about this evening. The first of those is聽聽
[15]
an update on the 2nd & Bryant construction聽
project and the intersection improvements.聽聽
[21]
Our contractor for that project is Crossland聽
Heavy Construction, and they recently聽聽
[27]
switched the east-west traffic to the new pavement聽
side. The old pavement in the intersection has聽聽
[33]
also been replaced, and soon the north-south聽
traffic will be switched to new pavement as well聽聽
[40]
as soon as the weather cooperates and we get to聽
that point as well. The project is scheduled to be聽聽
[46]
completed late this summer. Just as a reminder,聽
the project includes the installation of both聽聽
[55]
dual left-turn and single right-turn lanes in all聽
directions. The cost of the project is about $7.5聽聽
[62]
million dollars, and the funding comes from the聽
2017 repurposed capital improvement sales tax.聽聽
[69]
And as another reminder, we apologize again聽
for the major inconvenience for both the聽聽
[77]
traveling public and the businesses in the聽
area because we certainly know that it is.聽聽
[81]
So we're moving forward as quick as we can. The聽
second item is an update on the KickingBird golf聽聽
[88]
course expansion. You can divide this into two聽
main phases but a lot of moving parts to the聽聽
[94]
major work that is being accomplished in both聽
sections. Let's talk about the golf club design聽聽
[101]
and renovation project first. The slab has been聽
poured and the steel is going up, as you can see,聽聽
[107]
at the Special Events Center. There's the clock聽
tower. That structure is also under construction.聽聽
[116]
The basement walls, floors, and entries聽
have been constructed for the underground聽聽
[120]
cart barn as well. Gravel and light pole bases聽
have been installed for the parking lot. The聽聽
[128]
floors have been poured for the indoor teaching聽
facility and also the driving range pavilion.聽聽
[135]
And rough grading for the short-game practice聽
facility has also been completed. The other piece聽聽
[141]
of this is the golf course greens and irrigation聽
project. Greens mix has been put in the greens on聽聽
[148]
holes 10 through 15 and 17, and also holes 1, 2,聽
and 4. Final grades have been completed on greens聽聽
[157]
3 and 5 and pea gravel installed. Greens聽
6 through 8 are also being rough graded.聽聽
[164]
Tee boxes have been sodded on holes 12 through聽
17 and 5. The surrounding area of the greens聽聽
[172]
have been sodded on holes 10, 12, 13, and 15.聽
Irrigation has been completed on holes 12 through聽聽
[180]
15 and 17. Bunker liners have been installed on聽
holes 12, 14, and 4. And the cart trail on hole 16聽聽
[190]
has been installed as well as the pipe for the new聽
sub air system on hole number 4. And the estimated聽聽
[199]
total cost for all improvements is around聽
$20 million dollars. These improvements were聽聽
[205]
initially paid for as part of a $40 million dollar聽
bank financing package that occurred last summer聽聽
[213]
with, ultimately, the repayment to come from聽
the 2000 capital improvement sales tax. But聽聽
[219]
for people that drive by out there you get聽
just a very small feel for what's going on, but聽聽
[225]
as you can tell by these pictures, major聽
major major work there. And in effect,聽聽
[231]
we're going to have basically a new course with聽
a new clubhouse, clock tower, etc, etc. So very聽聽
[237]
exciting project. The third item is the expansion聽
of the Cross Timbers Public Works facility.聽聽
[244]
Initially, these improvements were divided聽
into two phases with the first phase聽聽
[249]
was this: constructing the fabric protective聽
structures to protect City vehicles,聽聽
[256]
and that phase was completed a few years ago. The聽
Phase II improvements will include two additional聽聽
[263]
equipment storage sheds, a touchless vehicle聽
wash station, repurposing the existing wash聽聽
[270]
bay to an equipment truck wash station, and the聽
expansion of the outdoor storage area as well.聽聽
[278]
Phase II will soon go out to bid, and the聽
estimated cost of that phase is $6.2 million,聽聽
[283]
and the funding is proposed to come from聽
the 2000 capital improvement sales tax.聽聽
[288]
And then the fourth item is an update on sales聽
and use taxes. Our economy continues to be very聽聽
[295]
blessed with both sales and use tax revenue. This聽
month's data reflects collections that occurred聽聽
[302]
during the month, or received for the month of聽
December. Sales tax revenue was up over 16.5% over聽聽
[310]
the same month last year. And now cumulatively,聽
it is up 9.3% for the year, the fiscal year.聽聽
[318]
Use tax collections were up 7% from a year ago,聽
and now cumulatively, 15% for the fiscal year.聽聽
[327]
Combined collections are cumulatively 10.7%聽
higher this year than last year. And just as聽聽
[334]
a reminder and a comparison, the annual budget聽
projections included a 3.25% increase in sales聽聽
[342]
tax and a 10% increase in use tax. So obviously,聽
we're doing very well, very healthy numbers there.