the world we build impacts almost every
[17]
human being on this planet
[18]
from the environments that we call home
[21]
to the way we travel generates our
[24]
energy drive our economies and shape our
[26]
children it is the construction sector
[29]
that underpins the direction of our
[31]
societies but despite its fundamental
[34]
impact on our way of life our approach
[37]
to construction has changed little over
[39]
the ages and we still use many of the
[41]
same techniques and materials to build
[43]
prototype structures in volatile outdoor
[46]
environments
[49]
now as our planet experiences
[52]
unprecedented change the sector is
[54]
embracing rapid advances in digital
[56]
technologies and making a bold shift
[59]
towards the world of manufacturing
[61]
merging the two to usher in a new door
[68]
[Music]
[74]
for centuries the way we construct our
[77]
world has remained largely unchanged
[80]
still using many of the same materials
[82]
and processes each project that the
[85]
construction sector undertakes requires
[87]
the delivery of a unique product in a
[90]
unique outdoor location
[93]
moving works away from the challenges of
[96]
each site and into controlled conditions
[98]
offers many benefits
[100]
economies of scale can be achieved
[102]
through automated production lines
[104]
productivity can be significantly
[106]
improved and quality can be ensured such
[110]
an approach also reduces the amount of
[112]
time that a project is on-site for
[114]
helping to lower costs negate
[116]
site-specific challenges and to minimize
[118]
disruption
[120]
the extent to which construction works
[122]
are taken away from their final sites
[124]
varies hugely
[126]
while volumetric solutions create entire
[130]
enclosed spaces remotely and then
[132]
deliver those to site for installation
[134]
non volumetric systems are large
[136]
elements of a building or structure that
[138]
are prefabricated before being brought
[140]
to site on a more granular level
[144]
component based approaches and platform
[146]
systems creates a kit of paths and draw
[149]
from a series of predetermined items
[151]
that are consistent across a number of
[154]
projects each of these off-site
[156]
construction approaches offer different
[159]
benefits and each has its advantages
[161]
depending on the type of project being
[163]
built however non volumetric and
[167]
component based approaches can retain
[169]
the benefits of off-site production
[171]
while offering the adaptability needed
[173]
across the many different types of sites
[175]
that the construction industry contends
[177]
with
[183]
but despite the seemingly compelling
[186]
benefits over several decades the
[188]
concept of off-site construction has
[191]
struggles to find traction now with many
[194]
countries facing rising populations
[196]
housing crises and a lack of skilled
[199]
people coming into their construction
[201]
workforces and with technology coming to
[204]
the fore there is renewed excitement in
[206]
the concepts it is technology in
[210]
particular that is helping to make the
[211]
step change and overcome the
[213]
long-established barriers the rise of
[216]
automation is hugely increasing
[217]
productivity on production lines while
[220]
digital design information is helping to
[222]
streamline processes and increase
[224]
accuracy it is in this way that the
[228]
concept of off-site construction is
[230]
rapidly evolving into offsites
[232]
manufacturing a shift that sees the
[235]
construction process move much closer to
[237]
the approaches of the manufacturing
[238]
sector and the techniques it has honed
[242]
that shift can be clearly witnessed at
[245]
the UK's explore industrial park
[248]
conceived and owned by Laing O'Rourke a
[250]
global general contractor with some
[252]
13,000 staff and an 8 billion pound
[255]
pipeline the vast factory is the most
[258]
automated concrete product facility in
[260]
Europe
[263]
since opening in 2009 Explorer has
[267]
manufactured concrete elements for some
[269]
of the UK's most impressive projects
[271]
including London's 48 storied Leadenhall
[274]
skyscraper and terminal 2 at Heathrow
[277]
Airport
[279]
Explorer industry our Park is one of the
[282]
most advanced precast manufacturing
[285]
facilities in Europe it allows the lung
[287]
our crew to control its own supply chain
[289]
to a large extent we can react quite
[292]
quickly to requirements on-site as a
[294]
result of that with the IP Allegra has
[296]
managed to move 70% of its on-site
[299]
manufacture to of an off-site means and
[301]
that's brought a 60% increase in
[304]
productivity and a 30% increase in
[307]
accuracy to the delivery schedule
[310]
what sets us apart from other precast
[313]
manufacturers is our use of automation
[315]
through machinery on the factory floor
[317]
also software tools that we use in we do
[320]
a lot of engineering of our processes to
[322]
ensure it as as efficient as possible
[325]
automation is very much a part of that
[328]
paradigm shift and having the right
[331]
automation can eliminate most of the
[334]
issues a typical design process would
[337]
encounter so your human area uncertainty
[340]
your factor of risk everything else is
[342]
just eliminated when you have a reliable
[344]
precise system doing it for you
[349]
throughout the last 10 years
[352]
explore Industrial Park has continually
[354]
evolved and innovated embracing
[357]
automation and digital technologies as
[359]
they have matured
[361]
repetition honed processes quality
[364]
control and a consistent flow of work
[366]
are all key to the facility's success in
[369]
this context it is critical that the
[372]
design information shared with the
[374]
production teams that is used to cast
[376]
and form concrete components is accurate
[381]
for major projects like Manchester
[383]
airports transformation program and
[385]
Liverpool's new specialist cancer
[387]
hospital both of which are currently
[389]
moving through the factory the
[391]
importance of accurate digital data
[393]
could not be more acute
[396]
errors in production can slow the
[399]
overall progress of projects affect
[402]
other activities out on the construction
[403]
sites and mess up the factories work
[406]
schedule costing time and money because
[409]
we're the point where things are cast in
[412]
concrete as they would say it's it's
[414]
quite important that we assess every
[416]
single facet of the design from a
[418]
project landing and explore we would
[420]
meet with a site team the clients
[422]
architects and structural engineering
[423]
consultants is as well as interfacing
[426]
disciplines we'd go through the product
[429]
set look for similarities between
[430]
different component types and we try to
[433]
rationalize them this allows us to
[435]
achieve a level of standardization
[437]
across a project we take the concept
[440]
that the architects and the engineers
[442]
want to enforce and bring that to
[444]
reality so we have to think about how
[448]
manufacturable it is how handleable it
[450]
is and how viable it is for the build
[452]
where typical manufacturer would
[454]
generally produce one product type in
[456]
one preakness Factory this precast
[459]
Factory we produce multiple so we can
[461]
supply all the precast on the project
[463]
that allows a certain level of
[465]
coordination between the different
[467]
product sets other things that set us
[469]
apart are the complexity of the products
[471]
that we're willing to manufacture
[473]
traditionally precast concrete is it's
[476]
very simple geometries we do a lot of
[478]
architectural product here that explore
[480]
that might not find elsewhere
[483]
from the outset of a projects Laing
[486]
O'Rourke steams consider which elements
[488]
could be fabricated away from the
[489]
construction site
[491]
working within the broad parameters of
[493]
what the factory can achieve they then
[495]
developed detailed design information
[497]
models to inform both the construction
[499]
and operation process and the
[502]
manufacturing of components
[504]
to ensure the accuracy of their digital
[507]
information the team use Sallee Bri
[509]
office to validate its contents
[512]
pulling information from various
[514]
different members of the design team
[516]
into a single combined or federated
[518]
information model in Sallee Bree the
[521]
tool can then be used to check the
[522]
quality of that data communicate any
[525]
issues enable quantity takeoff and
[527]
classify components
[530]
with their desired information quality
[532]
checks the team then issued digital
[534]
production information directly to the
[536]
factory floor where the process of
[539]
component manufacture begins
[541]
from the cutting and fabrication of
[543]
steel reinforcement cages including
[546]
placement of the ties to the
[548]
distribution of concrete across the
[549]
factory the pouring of that concrete and
[552]
the process of curing it Laing O'Rourke
[554]
manufacturing process is highly
[556]
automated helping projects delivered
[559]
through Explorer to take significant
[561]
strides in productivity
[563]
once produced the building elements are
[566]
loaded onto vehicles taking into account
[568]
the order that they will need to be
[569]
unloaded in and are transported to their
[572]
sites
[573]
those on the ground in the project's
[576]
location are able to seamlessly engage
[578]
with and see the data about their scheme
[580]
through tools like syllabary anywhere
[582]
which enables access by any member of a
[585]
project team wherever they may be and
[587]
syllabary site specifically tailored to
[590]
those working in the field the
[592]
geographic positioning of Explorer in
[594]
the very center of the UK is deliberate
[597]
and the factory has created components
[599]
for sites in both the South of England
[601]
and in Scotland
[603]
from the outset of the design process
[605]
right through manufacturing to the
[608]
delivery and installation of components
[610]
on-site and the operation of the built
[612]
asset afterwards
[614]
the entire process is informed by
[616]
digital data
[617]
the success of such projects is
[620]
therefore dependent on the quality of
[622]
the data used and the idea of not
[624]
quality checking or validating it seems
[627]
very risky if something is inaccurate it
[630]
cannot only be at the detriment of your
[632]
product and your quality in your safety
[634]
but it's immediately visible in your
[637]
coordination checks I mean as a species
[639]
were quite a visual species so now that
[643]
we're doing everything in 3d it needs to
[644]
be spot-on or you will know about it one
[648]
of the things that we use suite before
[650]
primarily is checking the quality of the
[652]
incoming information so cria had tours
[655]
receiving information as well we provide
[658]
the consulting engineers or architects
[661]
with a library of standard objects
[664]
produce a bit object library we then
[667]
pass that back to the consulting
[670]
engineers they populate their model and
[672]
then provide the site information we'd
[674]
also do checks between the different
[676]
precursor elements for construction
[677]
joints to make sure that as per the
[680]
agreed details you're able to streamline
[683]
the design in the best way possible and
[685]
ensure that everything works before it's
[687]
tangible in any way shape or form so for
[691]
us it's it's very key that we get the
[693]
models and all our theoretical
[695]
understanding of the entire structure
[698]
spot-on before we get anywhere near the
[701]
floor sites once all the issues have
[703]
been closed out then we would transfer
[706]
the model through into our precast RC
[708]
detailing platform we add more detail to
[712]
the models and we'd be adding
[713]
information such as custom fixtures
[715]
reinforcing bars
[716]
basically to get a digital model as to
[719]
what we're trying to produce actually
[721]
our in the factory having a safe system
[724]
that is able to carry out these checks
[726]
for us it eliminates the possibility of
[728]
human error and uncertainty
[730]
giving us a much better outcome in the
[733]
way that the product is built
[734]
information of being right has impacts
[737]
to every single facet of the system
[739]
because if you think about not just the
[742]
safety and the economy of the whole
[744]
thing it's the environmental impact as
[746]
well so to move six tons of concrete all
[748]
the way down to projects let's say in
[750]
London or up in Edinburgh and to have it
[753]
wrong on site waste a lot of time and
[755]
money so it's always key that we
[758]
get it right the first time
[761]
explore industrial park effectively sees
[764]
to of constructions most disruptive new
[767]
innovations come together under one roof
[769]
off sites manufacturing enabled and
[772]
further advanced by digital technology
[776]
run on digital data Laing O'Rourke use
[779]
of Sallee berry during design
[781]
manufacture and final assembly is key to
[784]
ensuring the process runs smoothly
[786]
underpinning the success of countless
[788]
projects indeed as our world becomes
[791]
ever more dependent on data ensuring the
[794]
accuracy of that data so that it can
[796]
serve us in the best ways possible is
[798]
critical it's about having control
[801]
conditions control quality precision all
[804]
of the good things you get from a
[806]
factory setting that you may not ideally
[809]
have the ability to implement on-site
[811]
there's a lot of complexity in their
[813]
systems that we have based at ERP as a
[817]
factory we look at ourselves as any
[819]
other factory the same way an automotive
[821]
factory would look at the way they
[822]
manufacture things while we are indeed
[825]
in a very archaic industry that hasn't
[828]
changed much since Egyptians we're
[831]
trying to be the best we can be by
[832]
looking at industries that are
[834]
fundamentally ahead of the game in the
[837]
way they produce things so we're not
[839]
trying to just be the best construction
[842]
concrete facility we can be we're
[845]
actually trying to be the best
[847]
manufacturing company we can be the
[849]
approach is employed at explore
[851]
industrial park that can offer
[853]
improvements in productivity of sixty
[855]
percent could be the answer to making a
[857]
step change in overall performance
[859]
across the wider industry
[862]
with others now following suit and with
[865]
the trend gaining in momentum across the
[867]
sector worldwide
[869]
combining the power of digital
[871]
technologies with the approaches that
[873]
have made manufacturing so successful is
[875]
seemingly ushering in a digital
[878]
manufacturing revolution in construction
[880]
that could transform the built world
[883]
shaping all of our lives
[886]
you